One Bridge Under Five Bridges.
On Saturday, February 15, 2025, the third and final arch span for the Portal North Bright was floated up the Hackensack River from Newark Bay to the bridge site. Tugboats Erin Elizabeth, CMT Pike, and Helen guided the span as it passed under six other bridges along the way. Here the floatilla is seen waiting for PATH traffic to cross the Hackensack River Bridge so that it could be raised.