One Bridge Under Five Bridges.
On Saturday, February 15, 2025, the third and final arch span for the Portal North Bright was floated up the Hackensack River from Newark Bay to the bridge site. Tugboats Erin Elizabeth, CMT Pike, and Helen guided the span as it passed under six other bridges along the way. Here we see the span emerging from under the Wittpenn Bridge, as one of the smaller tugs approaches to help guide Erin Elizabeth and the barge.