To complete their work at Fairmount and Hankinson, ND, Red River Valley & Western must utilize trackage rights on both the BNSF and Canadian Pacific. Here, they are in between both railroads as they transfer from the BN to the CP at Nashua,MN. Todays turn needed six geeps to keep the freight moving. Something I've never before seen.