Nearly daily the fuel depot at the Fürth harbour, part of the Rhein-Main-Donau Channel (connecting Rhine /Main with Donau), gets a train with tank wagons. The tracks in the depot are short, so there is some shunting to do. At that evening the Engine of N1 rail service, a former DR V100 type, shunts full tank wagons into the depot yard, while the train with empty wagons is put to a track along the quay in the left part of the picture