Crawling along at 10 MPH, the hauler wends its way up the Yaquina River Valley beside HWY 180, AKA Nashville Road at this point. The former SP route leads up and over the Coast Range Mountains of western Oregon. This job is working through a 7+ hour, 74.7 mile long trek bound for Albany, Oregon pulling a 14 car train loaded with wood products from the Georgia Pacific Mill at Toledo, Oregon. The consist also includes sister #3002, GP39-2 #2310 and the two slug helper engines #101 & #102.