Four GE locomotives work hard up the western slope of the Arizona Divide with a heavy Los Angeles, CA to Logistics Park Chicago, IL intermodal train. The crew is about 15 miles away from reaching the 7,335 FT high summit of the Arizona Divide after starting their trip in Needles, CA; 500 FT above sea level.