Eight locomotives lead an upgrade Burlington Northern Santa Fe intermodal train through Tunnel 10 just east of Walong, California, on March 5, 2001. This area is a bit different now, as a second track goes through a cut just to the right of the Tunnel, essentially making it double track from the east end of Marcel to the west end of Walong.