On the first day of Fall, the hottest train on CSX rolls down the Mohawk Valley in Upstate NY. The train is passing Lock 13 on the NYS Barge Canal. The UP OCS ran from Buffalo-Frontier to the Railex produce facility in South Schenectady, NY. Run time was 4 hours and 23 minutes for the 274 mile run. UP 9090 is trailing unit. The OCS originated in Chicago on Friday morning, overnighting in Buffalo.