Montana Rail Link’s Helena switch works upgrade into Winston, Montana, on the morning of July 5, 2018. This is the “local” out of Helena that switches the cement plant and RY Timber at Townsend is powered by MRL No. 262, a rebuilt SD40 labeled a SD40-2XR, and venerable GP9 No. 109.