The 25-mile slog up Cajon Pass’ western slope is about done for BNSF train Z-SBDWSP9-27 as it crests the Summit and will shortly begin the gentler downhill run to Victorville. Nine General Electric diesels (ES44C4 6944, ET44C4 3863, ES44C4 6542, ES44DC 7815, ES44C4 4290, Dash 9-44CW 5461, ET44C4 3960 and ES44DC 7265) are powering this long Priority UPS-LTL Intermodal train – 80 loads, 8320 feet and 5869 tons heading from San Bernardino to Willow Springs IL. (Summit, Cajon Pass, California – December 27, 2019)