Southbound Soo Line train 18 divides Allenton, Wisconsin, on the afternoon August 23, 1987. The train is led by Soo GP9 No. 2402, built by EMD in December 1954. This main line through Allenton between Chicago and North Fond du Lac would become part of the Wisconsin Central in six weeks.