On May 13, 2024, the second new Be 4/6 # 101 train was delivered by StadlerRail for the Lauterbrunen-Mürren mountain railroad, more precisely the adhesion line between Grütschalp and Mürren. At the Winteregg junction station, the first car body of the two-car train is being placed on the front engine bogie. Later, the rear section is placed on the Jakobs bogie, and the second coach body is placed the following day. The BLM gets 3 of this new Be 4/6 railcars.