Railcare's Euro9000 locomotives have not been used for several months, apparently due to software problems with train protection. The first freight trains have been running again for a few days now. The 2019 # 321 from European Loc Pool (ELP), built by StadlerRail in Valencia/Spain, rented to the Railcare, pulls the freight train 63659 from Wangen bei Olten (load attached in Hägendorf) via Solothurn-Biel VL-Zollikofen-Spiez-Lötschberg Base Tunnel to Brig, between Uttigen and Thun. The load consists of six-axle articulated VTG Sggmrss wagons loaded with Coop containers.