Let me see...hit corrections button, change locomotive description..OK These are built (or rebuilt) from Budd M1's ..I should know better. These 8 were built in the late 1970's. The LIRR actually tested GTEL's in the 1960's.
|
Posted by bill on September 15, 2006 | |
I ahve to original rollsigns that were installed on these!!
|
It looks so un-natural to see an M1 without a 3rd rail.
|
|