Posted by on April 26, 2013 | |
The building behind the train is the Copperton Concentrator. Ore is fed here via around six miles of conveyorfrom inside the pit. From current pictures, it looks like the crusher and conveyor survived the massive slide April 10. Ore is fed from the left of the picture and stored in the a frame structure and moved by smaller conveyors from the stockpile into the grinding building. The top of the A frame and raised conveyor is roughly 14 stories at its apex.
|
|