Posted by pierre fournier on July 7, 2017 
No room in the tunnel for wide loads.
Posted by David Rohdenburg on July 7, 2017 
The Track 2 Portal, out of frame to the right, has Double Stack clearance, but currently no intermodal traffic uses this route.
- Post a Comment -