Posted by mmi16 on February 10, 2020 
While the 6025 has been assigned to the Geometry Train for 30 years or more - I have never understood why it has not been equipped to operate with every from of 'Train Control' that is operated on the CSX system. It always requires a 'pilot' engine to operate on the RF&P and other TC territories.
- Post a Comment -