Forty-Four Years A little over forty-four years ago, the Lehigh Valley Railroad ceased to exist, and I took my last photo of a real, unpatched road unit leading a train. Much of my... (more)
Spring has bought lush green foliage back to the hills around the Susquehanna River as a westbound Conrail COFC train rolls through Aqueduct, Pennsylvania.
Westbound pigs roll along the Susquehanna River on Conrail’s Middle Division at Aqueduct, Pennsylvania.
Eastbound manifest , at mp 124.
Eastbound high and wide extra , at mp 124.
With a set of ES44ACs in the lead 18N breaks the silence of the of the small town on Aqueduct, and knocking down the signals at MP 124.
Splitting the signals at MP 124 on the NS Pittsburgh Line, this Empty steal slab train roars along at track speed.
A sight becoming continually more difficult to see on the NS Pittsburgh Line, NS SD40-2 # 3362 is solely in charge of High and Wide Train 059-30. The 059-30 is seen here Eastbound at Aqeuduct, PA ... (more)
Eleven days after being placed into service, 6308 leads a tie train to Duncannon to do some work.
NS eastbound Triple Crown train 262, with 132 trailers, is speeding through Aqueduct, Pennsylvania, on its way to the Rutherford Triple Crown terminal on the east side of Harrisburg. On this day,... (more)
After a fresh snowfall from the day and night before 12G kicks up some powder as they head towards Enola Yard.
An eastbound NS doublestack train is passing over the defect detector at Aqueduct, Pennsylvania.
20T's entire consist fits on the long straight away at Aqueduct, splitting the classic PRR postion lights at MP 124.
NS 2694 leads manifest train 36A east towards Enola Yard on track 1.
NS 9327 leads loaded coal train, NS 526, east on track 1 at Linton Hill Rd., while in the distance the tail-end of 21G can be seen heading west on track 2.