The rear end of this eastbound stack train may still be stretched across the Elkhorn River Bridge as the head end works its way thru the curve next to the elevator in Arlington, NE
Eastbound stacks are descending Arlington Hill between Arlington and Kennard. The equipment on the right side of the frame was used the previous day to sink a footing for a 16kv transmission line ... (more)
Eastbound stacks are descending Arlington Hill between Arlington and Kennard on the Blair Sub. The grade for a second main track that has yet to be built here has opened up some nice views on the ... (more)