Watco did a 3 day ballasting program for Arc Infrastructure in late October. DR1564 & DR1565 pull a loaded ballast train from Brunswick Junction to Warrawarrup on 28th October 2020. They then ran ... (more)
The scenic Whiterocks Farm in the southwest near Benger sees 7271 loaded lime from Soundcem to Hamilton race by with S3301 in charge.