The "BN-CP" waits for the "CN-1" to clear out of the yard.
A gathering of two yard jobs, stored locos & two foreign jobs this morning. The CP-BN had to scoot out of the way of the CN transfer, heading to get its cut, as well as another inbound train (out... (more)
Two year old Burlington Northern was starting to build its own identity in motive power with the acquisition of SD40-2s of which they would acquire the largest roster in the US. This consist shows... (more)
The ever-changing storage line.
Two area locals side by side. The other will run to CP St Paul.
Hump job working Northtown.
One of several strings of stored locomotives. 2742 is classified as a rebuild GP39E, but obviously began life as a GP30. Ex-CB&Q 947
The return of "Big Boy" #4014 from Duluth.
The ever-changing collection of storage locomotives is bracketed by two yard jobs.
Stored BN power at Northtown.
Northtown Hump job finishes shoving a cut over the hump.
A couple of ex-BN units are building a train in BNSF's Northtown Yard.