D100 BB 580 009 reaches Deißlingen-Lauffen with a rake of container wagons, loaden with excavation material from the Stuttgart-21 tunnel project.
294 588 from DB Cargo heads the Deißlingen local back to Villingen.
212 024 enters the siding of Lauffen gypsum plant with a rake of container wagons, loaden with excavation material from the Stuttgart-21 tunnel project.