A friend of mine occupies the conductor seat of this intermodal train as it rolls north through Dickert. Looks like this 20 year old beast could use a little soap and water.
Approaching at 50mph a GEVO escorts 7,700 feet of train (81 autoracks) through Dickert. It's now over 300 miles away from its starting point in Baldwin, FL.
Rushing north enveloped by the golden hour, 10 locomotives are on the point of this now abolished train. This train use to operate daily from Waycross, GA to Birmingham, AL. Traveling at 50mph on... (more)
What do you do to make two different things come together and work as one?... "COMPROMISE" That's exactly what is done to join two different size rails. A 136 lb rail and 100 lb rail a... (more)
Empty hoopers move swiftly taking up 5,958 feet of mainline with CSX power doubled up front and a single unit on the rear (CSX #3147). CSX Transportation engine #949 was the last built with whit... (more)