Three clean '45s about to shuttle some coal empties to CSXT for a run down the Mon Sub.
We knew the B&P was going to head south to the P&W sub, but didn't realize the BTNC was waiting at Eidenau for the AK-1 job to clear. So we got a shot of BTNC heading back to Butler from New Castl... (more)
Light power has come down from Butler to retrieve 130 coal loads from CSX.
Eastbound empty hoppers on the P&W at Eidenau Jct.
Chessie Safety Express on the P&W Sub.
Chessie work train dropping ties at Harmony Jct. The line to the left goes to New Castle (rr WB), the line to the right to Butler and points east.
The Chicago Jet was rerouted over the P&W due to a broken rail on the P&LE, its normal river-level route west. The Butler Sub curls off to the left in the background.