BNSF's second bridge over the Pecos River bottleneck at Fort Sumner, New Mexico was scheduled to be placed into service today (July 25, 2016). A little over two months prior westbound QCXOLAC1-13L... (more)
BNSF's second bridge over the Pecos River bottleneck at Fort Sumner, New Mexico was scheduled to be placed into service today (July 25, 2016). A little over two months prior an eastbound stack tra... (more)
Contract construction crews are finishing the final concrete base pour on the main span over the Pecos River as the hot ZLACNYC9-13L with 3.9 horsepower per ton races eastbound with 5,600 tons and... (more)
After letting a hot Z-train run around it, BNSF 5002 and BNSF 7478 head west across the very long and high Fort Sumner bridge. Only time will tell if the BNSF builds a second bridge here to remov... (more)
FORT SUMNER NM June 21 1986 -- On the longest day of the year Santa Fe GP35u 2964 is eastbound over U.S. 60 with a TOFC train. EMD built the unit in May 1969 as TP&W 1000.