Under a heavy rain shower, an eastbound works downgrade as seen from the overlook at Foley on a cool fall day.
The entire consist of an eastbound intermodal is visible as the train works downgrade at railroad Foley.
Rear DPU unit swings around the curve out of Glencoe as it assists an empty hopper train up the east slope of Sand Patch Grade.
A single ES44 is in the lead as this stack train climbs Sand Patch Grade through Glencoe.
A lone unit is on the point as an eastbound intermodal makes it's way down the east slope of Sandpatch Grade on the final day of Spring 2022.
A lone unit is on the point of an eastbound intermodal as it drops downgrade alongside of Wills Creek at railroad Foley.
Heading east, an autorack glides downgrade just outside of the small town of Glencoe on a beautiful fall day.
Splitting the signals as seen from the overlook at Foley
A pair of GE's hold back a loaded unit coal train as it works it's way down the east slope of Sandpatch Grade.
Westbound Q375 powers out of a dip between Glencoe and Philson, Pa.
An eastbound mixed freight pulls through Roddy's Sag between Philson and Glencoe, Pa.
Westbound autoracks (Q249) split the signals at Glencoe, Pa.
A patched ex-Conrail unit leads Q297 through Glencoe, Pa.
The late day sun glints off an eastbound manifest as is works its way down Sand Patch grade at Foley.