The Albert Lea local works back north on the Spineline near Glenville. This job makes a Mason City turn on M/W/F with local work at Glenville and interchange work with the Iowa Northern at Manly. ... (more)
On September 17, 2018, the CN Osage Sub was officially shorten to MP 83.6, couple miles west of London. The trackage to Glenville has been out of service for awhile now, and looks like its going t... (more)
It took most of the day and hundreds of miles to finally catch up to this train. Unfortunately they had already tied the train down for the end of the day by the time I arrived. The day was not ... (more)
The Cedar River is pulling into Glenville as their day begins. This crew went to work at 16:00 at Osage and cabbed to their train from yesterday near Glenville. They will now have to runaround the... (more)
The Cedar River is busy setting out their inbound train and getting outbound cars together for the trip back south. The Cedar River runs 6 days a week and does work on the Osage Sub and works in a... (more)
Tv 1/320, F 8.0, ISO 100, 88.0 mm
Heading South on the Spine Line
The DM&E prepares to set out cars for the CN's Ceder River Railroad at Glenville, MN.