Rounding the curve at Highland Lake, it's the end of the journey for this crew with a new crew arriving shortly to finish the trip into Two Harbors yard.
CN 2007 leads a trio of GE C40-8s making good time up the grade from Two Harbors, MN at Highland Lake passing siding.The empty train is headed back to Minntac for a refill. CN 2007 was acquired by... (more)
This tie was last replaced in 1962. The date nail tells the story. This is one rugged hunk of wood, bearing 54 Minnesota winters.
Railroads employed "date nails" to mark the last time ties were replaced. I have only come across these relics on what is now the CN Iron Range Sub and in Two Harbors outside the museum. The most... (more)
Waiting for over an hour without a peep out of the scanner--finally a squawk. But no ore train just a local headed to North Wales, then Biwabik.
The orange nose of B&LE 904 blends in nicely to the all fall color of northern Minnesota.
DM&IR leads loads from Minntac around the curve at Highland Lake where this crew will die on hours. A new crew is called and will take the train over the scale and begin the decent down to Two Ha... (more)
The old crew gets off and the new crew prepares to get on to take the new CN/DMIR ore cars loaded with Minntac iron ore pellets over the scale at Highland to weigh the train in preparation for the... (more)