“WEEKEND DUALMODES” Train 6609 to Penn Station is passing the PL pedestal signal that controls westbound moves into Huntington Station. Switch on left is not in use since Nassau-Suffolk Lumbe... (more)
LIRR track workers are back working after the RS 40 has passed. The crew are on the way to Kleet Lumber for their weekly switch. Unfortunately the work caused both eastbound and westbound moves to... (more)
The crew is switching Nassau-Suffolk Lumber with GP38-2's 271 & 270 as Power. This location is now Riverhead Building Supply that does not receive rail shipments. After the switch the 70 will head... (more)
The Saturday freight from Fresh Pond to Kleet Lumber in Huntington and return. MP15AC 151 and GP38-2 271 have four empties in tow westbound thru the signals. Kleet Lumber is the last customer east... (more)