The weld of rails.The colliquation of steel inside the bain-marie.The fluid metal will switch the rails after 5 minutes about.
Every noon this athlete was running on the lines a big distance.
The works for the construction of the new bridge is a fact. The 1st metal part for the bridge is's arrived to be placed. The meter gauge line via Tripolis will be ready to run after 3 months about... (more)
The absolut reflection...
A dmu unit at Meligalas station.
METER GAUGE