The sun has just risen and the fog is starting to burn off and a pair of SD38's and a SD40-2 have the duty to bring an empty coal train to Bear Run Mine to be loaded.
Moving compass East and timetable North, CBRED passes through the improved connection at Linton to switch to timetable South and complete its short trip back to ISRR rails at Beehunter.
Pre-Santa Train passenger special slams through the freshly rebuilt and now CTC-equipped interlocking at Linton at a cool 40mph (confirmed by Mr. AEI back there).
Believe it!