The first pull of taconite "fines" heads west through Murphy City early in the morning. After dropping the loads off at Trow siding, the Fs will return to the Tunnel siding to pick up more loads.
EMCO 4211 leads an empty train on it's way back to Hoyt Lakes with an old Griswald Signal protecting the crossing