The crew on NE-1 and the conductor on AP-2 greet each other as the caboose for AP-2 passes LV 639 on the head end of NE-1 at the Bufflehead Road crossing in Bridgewater, NJ on March 6, 1976. With... (more)
Right behind ME-2 came AP-2, led by U23Bs 503-512-502, past NE-1 at the Bufflehead Road crossing in Bridgewater, NJ on March 6, 1976. R.T. Steinbrenner Photo
Continuing the events of March 6, 1976, NE-1's progress soon stopped at the end of double track at the Bufflehead Road crossing in Bridgewater, NJ for a meet with Mercury-2 and Apollo-2. Here, GP... (more)
LV NE-1 has completed its work at South Plainfield and is back on the move, rolling through the Prospect Avenue crossing in New Market, NJ on March 6, 1976. This is my father's picture. R.T. ... (more)
A short intermodal/autorack mix heads east on the Lehigh Line
On a hazy Saturday morning NS intermodal train 22V storms through New Market, N.J.
Q300 has just departed Manville, N.J. and is en route to its terminus at Conrail's Oak Island Yard in Newark, N.J.
CSXT 5341 leads a WB past the park undergoing construction adjacent to New Market Lake.
18G was following the Q300
The Bombardier HR616 demonstrator set leaves North Bay eastbound on CP 482.
Emerging from deep shadows into the early evening sun, a GP40-2 with a road slug (made from a GP30) haul a work train west on the Lehigh line. Canon EOS 10D, 250@f5.6 (ISO 100), ~300mm