On a cold and sunny November morning, L509 rounds the waterworks curve off of the Leithton Subdivision at River Junction with a duo of IC SD70’s, seen here passing the John Deere that has been l... (more)
After holding at the connection at CP River for M336 to clear with the BCOL heritage ET44AC leading, L508/509 hops off the River Line and back onto the mainline after a day of work at East Morris ... (more)