A loaded FMG ore rake crosses the BHP overpass heading for the dumpers at Port Hedland, Western Australia.
A partial train of two SD70ACe-LCi locomotives and 135 loaded iron ore cars waits for the dumper to clear out at Finucane Island. The Roy Hill conveyor can been seen in the background which transp... (more)
A pair of AC44C6Ms pull an empty ore train towards the Solomon mine approaching Bow siding.
A loaded iron ore train runs northbound near Shaw.
Loaded FMG approaches the woodstock flyover with SD70ACe-P6 #730 in the lead.
A loaded FMG ore train passes the locomotive shop just a few kilometers before the dumpers.
Roy Hill empty iron ore train en route to Marble Bar
BHP Billiton is the largest of 3 railways that bring iron ore into to Port Hedland. Once dumped, the ore is conveyed to the stockpiles and then loaded onto ships that carry it to steel manufacturi... (more)
BHP 4338 and 4406 lead an iron ore train near Shaw.
FMG SD70ACe-P6 #730 approaches Nunna junction with a loaded train of iron ore bound for Port Hedland.
Roy Hill, the newest of the 4 Pilbara railways, runs a 240-wagon rake of iron ore from Marble Bar mine to the dumpers at Port Hedland.
A loaded FMG iron ore train runs from Rowley yard towards Boodarie to unload.
BHP SD70ACe 4314 at Red Bank, near Port Hedland, with a small portion of an iron ore train from mines in the east.
BHP Billiton SD70ACe's 4385 & 4416 lead a loaded iron ore train bound for Port Hedland with DPU units 4306 & 4351 just coming into sight in the distance halfway down the train.
New BHPBIO EMD SD70ACe / LCi locomotives undergoing acceptance tests.