Empties leave the James H. Miller Jr Power Plant with a Heritage 2 scheme BNSF unit bringing up the rear.
After being unloaded at Alabama Power Plant Miller, two BNSF coal trains sit waiting for a crew to take them back west for more coal. Plant Miller can be seen in the back right.
A former UP SW10, now a RailCon unit was assigned to the car maintenance location at Quinton, Alabama in August 2014, this facility serves Plant Miller train sets.
BNSF's daily U-EOLBIR Taconite train hustles through the tiny town of Quinton.
BNSF #9787 on track 4 waits it's turn to be unloaded at the APCO Miller Generating Plant as BNSF #5832 is a DPU on a emty Train on Track 1 in Palos Yard.
Coal loads for Alabama Power's Plant Miller in Palos arrive at the north end of the coal train holding yard at Quinton.
Transportation Services, Inc SW1500 #805 pulls down toward the I-22 bridge.
A northbound unit grain train passes the north end of the Plant Miller coal train holding yard, as a unit on an empty train is fired up.
Three SD40-2s and a GP60B are in charge of a southbound as it passes through Quinton. The multitude of tracks in the foreground are part of the coal train holding yard for Alabama Power's Plant Mi... (more)
The BNSF coal train, far left, has just completed unloading at Alabama Power Company's Miller Electric Generating Plant, at Palos, AL and is awaiting crew to head west. The locomotives, in backgro... (more)
Empty hopper