Through the Fields. On the second day of the charter, the FEC 148 pulls a cane train through the many properties of U.S. Sugar Corporation.
In an interesting turn of events, USSC 6324 would wound up being the power for Cane 3 after being taken off the Fort Pierce Turn. The tunnel motor would return leading LHF, picking up 10 loaded ca... (more)
USSC 409 leading Cane 3, rounding the Liberty Point curve towards the Shawnee loadout to pick up additional loaded cane cars.
Once done with their work at Wedgworth’s, the Sebring Turn would make the final stretch back to Clewiston before wrapping up the day.
SCFE 9027, 9029