Here the loaded T-Bird train has another load of raw iron ore for United Taconite's plant at Fairlane. This train, along with a counterpart, usually makes 2-4 round trips between Largo and Fairlan... (more)
Ex-DM&IR SD-M 317 leads a loaded train of crude taconite ore under the highway 37 overpass south of Iron Junction.