The Havelock job bites the curve at Tapley in some sweet afternoon lighting conditions.
Well into the climb up Maryanne's Hill, CP 3114, 3103, and 3134 lead T07's 33 cars through the narrow cut at Tapley. 1602hrs.
KLR T08 slowly rolls by on there way to Havelock with a trio of GP38-2's.
The Havelock Job meanders down the Kawartha Lakes Railway Havelock Subdivision with 3038 leading three other geeps and 32 cars for Toronto from Peterborough. Here we see the local rounding the cur... (more)
Having crested Maryanne's Hill, CP 3111, 3032, 3114 cross the Tapley 1/4 Line eastbound with T08's train. First matched set of power I've shot in any scheme on this line, with the 3111 looking sha... (more)
CP 3114 noses across the 1/4 Line at Tapley, Ontario, as a local girl does a double take, seemingly surprised at the sight of the train. 1140hrs.
Having bested the moraine, CP 3114 pokes it's nose over the 1/4 Line at Tapley, Ontario, with CP 1271, SLH 8245, CP 8207, 3043 and KLR train T08 in tow. 1239hrs.
With the hills of the moraine now largely behind them, CP 3114, 1271, SLH 8245, CP 8207 and 3043 enter a broad valley at Tapley, Ontario, for the final stretch to Peterborough. CP 1271, along with... (more)