The Toledo Hauler switches cars in at the interchange with the plant switcher. An eclectic mix of EMD power leads the train.
Watco's contract switch operations at the mill in Toledo sported an ex-CSX GP30. Its seen awaiting the arrival of the inbound Toledo Hauler before switching out cars.
Power for SP's Toledo Switcher and Toledo Hauler is parked at the depot in Toledo. Shortline startup Willamette & Pacific was just eight days away.
The Toledo Hauler has arrived at its namesake, and the rear brakeman is preparing to line back the mainline switch. A few weeks later automated dragging equipment detectors were activated, and the... (more)
Power off inbound WPRR train 75 meets the Toledo Switcher at the end of the Toledo District in Toledo, Oregon. The roadfreight's power will return to Albany shortly with outbound traffic as WPRR t... (more)
Willamette & Pacific's Toledo Hauler arrives at its namesake, with a leased set of Southern Pacific power.
A rare daylight Toledo Hauler on the far west portion of the Toledo District switches out their outbound train just east of town with a set of geeps and road slugs.
at the yard in Toledo, off and cold
The Toledo Switcher hauls a ballast a car East. The switcher usually doesn't leave Toledo but it has some extra duty today.
The Toledo Switcher leaves town to dump ballast a few miles out of town. The plant in the background is Georgia Pacific's Toledo paper mill. The plant is the main reason for the Toledo Switcher's ... (more)
Toledo Hauler power after arrival in Toledo
Lettered for Willamette & Pacific RR Special
This Train is awaiting the C.E.O and other gests of the Genesee & Wyoming Railroad
A Loaded Fright train Drags a derailed car for 2+ miles, Causing a One and a Half acre Forest Fire, the train come to a crossing and then put Eight cars on the Ground. This is one of many picture... (more)