Aurizon 6043-ACB4401-6029 working a loaded coal train powers along the valley floor towards Sandy Hollow as they make their way to unload at Newcastle.
G&W Australia loaded coal train from Ulan Coal Mine powers beside the nearly dry due to the drought Goulburn River at Kerrabee worked by XRN001-XRN019-XRN025 as they make their way to unload at Ne... (more)
G&W Australial loaded coal train from Ulan Coal mine with a whole train of the newer orange hoppers runs along the valley floor near Sandy Hollow worked by locos XRN024-XRN022 and XRN029 as they ... (more)
Pacific National loaded DPU coal train from Ulan area runs along the valley floor near Sandy Hollow worked by locos TT132-TT131 on the front and TT02 pushing on the rear as they make their way to ... (more)
Aurizon loaded DPU coal train from Ulan area runs along the valley floor near Sandy Hollow in very late afternoon light, worked by loco 5041 on the front and 5042 pushing on the rear as they make ... (more)
G&W Australia loaded coal train from Ulan Coal runs along the valley floor near Sandy Hollow worked by loco's XRN016-XRN028-GWU006 on its way to unload at Newcastle.
G&W Australia loaded coal train from Ulan Coal runs mainline through the Wilpingjong crossing loop worked by loco's XRN016-XRN028-GWU006 as they also pass Wilpingjong Coal Mine next to the track p... (more)