GWA006-CLP8 with train 6MX1 depart Victoria Dock.
GWA006-CLP8 with train 6MX1 next to VL351 at Victoria Dock.
G535 departs Victoria Dock with train 7MP1.
G535 in a modified Freightliner / Aurizon colour scheme at Victoria Dock prior to running train 3MP1.
VL357-VL351 depart Victoria Dock with 9477 wagon transfer to North Dynon.
G533 on an Aurizon crew training run at Victoria Dock.
G533 stabled at Victoria Dock after a crew training run from Western Victoria.
CM3313 and G532 with cement and Maryvale loading at Victoria Dock.
CM3313-VL359 depart Victoria Dock with 5MS7 Qube cement train to NSW.
864-872 with a Qube wagon transfer to North Dynon departs Victoria Dock.
G515 prepares to attach to 9475 Maryvale paper train at Victoria Dock.
CF4405-CF4406-CM3315-VL362 await departure from Victoria Dock with 7MC7 Qube cement train.
VL351-G532 with 9475 down Maryvale paper train await departure from Victoria Dock.
G515 freshly repainted in Rail First Asset Management livery at Victoria Dock while on hire to Qube Logistics.
QL008-1101 depart Victoria Dock with 7MC7 Qube cement train.