A pair of Northern Lines Railway's GP15's lead a train of empty LPG tank cars as they return towards Saint Cloud after working the Rockville Propane Terminal. The train is passing by the crushers ... (more)
Another load of windmill parts, this time blades, heads out of the St. Cloud yard and out to Rockville for unloading. By sunset, all but six blades will have been unloaded.
A Northern Lines Railway employee helps prepare a train of rock for departure, having just finished loading it at the quarry in Waite Park. Power on this day was provided by two BNSF SD60M's.
Seen from the Division Street overpass in Waite Park, two recently re-activated SD60M's pull away from the Martin Marietta Aggregates quarry with a train of crushed granite.
A pair of reactivated SD60Ms lead this rock train through Waite Park and back to the yard in St. Cloud, where the BNSF will handle the loads from there. This train is currently being handled by No... (more)
After arriving the night before, this train has been loaded with rock from the quarry at Waite Park, and is now ready to back out of the siding, get weighed, and proceed down the main (foreground)... (more)
Its rare enough to catch a train on this former BN line, but even more so to catch a pair of recently reactivated SD60M's. There are only a handful of 60M's that are back in service. The train i... (more)
Yellow is in abundance in this scene as a Georgetown Rail Equipment ballast train heads to the Martin Marietta quarry to be loaded.