"Traverso" train RABe 526 # 118/218 of the Südostbahn (SOB) is leaving the 78 meter long Meienkreuz tunnel in the Meienreuss gorge on the Gotthard north ramp, running the IR 2418 TRENO ... (more)
"Traverso" train RABe 526 # 222/122 of the Südostbahn (SOB) is leaving the 1090 meter long Leggistein loop tunnel and crossing the Meienreuss gorge on the Gotthard north ramp, running t... (more)
Due to construction work in the Gotthard Base Tunnel, passenger trains will be rerouted via the Gotthard mountain route from January 13 to 25, 2025 and the base tunnel will be available for freigh... (more)
Due to construction work in the Gotthard Base Tunnel, passenger trains will be rerouted via the Gotthard mountain route from January 13 to 25, 2025 and the base tunnel will be available for freigh... (more)
Bombardier TRAXX F140 MS 186 # 497 of Railpool, rented by TR TransRail, pulls the empty excavation train 67673 from Flüelen to Airolo, through the Wattinger curve between Gurtnellen and Wassen on... (more)