On a beautiful Fall morning, the Milford-Bennington crew passes the small hydro-electric plant in Wilton, NH on their way South with 10 loads of stone in tow. This is the crew's second run of the ... (more)
On a beautiful Fall morning, the Milford-Bennington crew crosses the intersection of Burnt Hills Rd and Mill St heading Southbound with 10 loads of stone in tow. This is the crew's second run of t... (more)
After running around their train at Wilton, NA-1 heads back South, passing the hydro-electric power plant in Wilton, NH. The local is just South of MPI-16 with 2 empties from Hendrix Wire & Cable,... (more)
Milford-Bennington Railroad's SW9 #901 leads its loaded stone train south past the former depot in Wilton, NH.
Milford-Bennington Railroad's SW9 #901 pops out of the shadows as it leads its loaded stone train south through Wilton, NH.
Back on State-owned track, the MBRR crew throttles up past the Wilton Police Department and over Burns Hills Rd in Wilton, NH. This was the first run of the day and the crew was bringing the empty... (more)
This little RR operation was amazing to watch since there's nothing quite like it around! The SW9 shoves the train, caboose first, up to the quarry, loads the hoppers, and then the locomotive lea... (more)
After receiving permission to occupy the Yard Limits between Wilton and MP-I13 from the Pan Am Railways District 2 Dispatcher, Milford-Bennington continues South. Having been only the second time ... (more)
M&B passes the Souhegan Wood mill
M&B SW9 shoves empties into Wilton along the Hillsborough Mills Dam on the Souhegan River
Hauling ten cars loaded with stone from the quarry in So. Lyndeborough, Milford-Bennington 901 crosses the Souhegan River.
Hauling ten cars loaded with stone from the quarry in So. Lyndeborough, Milford-Bennington 901 blows for the crossing on NH-31.