Test run of PNR trainset, 1 locomotive CC3002001 and 5 coaches (Yayang Ari)
Bangunkarta train as it passed through the railroad crossing near the Jagir bridge towards its final destination, the Gubeng station.
Passengers Train, Penataran, passing Jagir Floodgate road to Malang Station from Surabaya Gubeng Station
K.A 1615 Fuel Wagon with Full loaded road to Bangil station from Benteng Station after filled on Pertamina Refinery and will be distribution