DF.1238 arrive at Yangon Central Railway Station
Trial of the refurbished Arco coaches from Guifões to Valença.
Yesterday, after a 5610 failure, the 2611 performed the service of the IC 722
Transport of the first 9, out of 51, UIC Eurofima type coaches bought in second hand by CP from Renfe.
CP 2600 with a cement train from Souselas to Leandro passing at Salreu.