A BMLP empty prepares to load it's train at Kayenta.
The last ever daylight BMLP coal load approaches the generating station in Page on August 25th 2019.
The last ever daylight run of the Black Mesa & Lake Powell cuts it's way through the northern Arizona desert.
Normally the Deseret Power Ry.'s swing shift finds a loaded train waiting for them when they come on duty at 4PM. Not today though. They did not start the loading process until nearly 6PM. This wa... (more)
The day's second loaded coal train is seen here a few miles from the line's terminus; the Bonanza Power Plant. Unlike most E60s found in coal services in the four corner states, the DPR-1 and DPR-... (more)
Today was one of those near perfect days for rail photography: strong, low, early winter sun, beautiful fluffy clouds, and absolutely crystal clear Rocky Mountain air. And it was cold too. I had s... (more)
Deseret Ry’s #DPR-2 has the daily loaded coal train rolling easily downgrade about 4 miles from its final destination, the Bonanza Power Plant. The terrain here is composed of colorful Tertiary... (more)
Nearing the end: E-60's in the shop for removal from service.