The CAMI 2 jobs is returning to CAMI after working the CN interchange in Ingersoll. A pair of ex CP SW1200's provide the muscle.
With work completed at Ingersoll, the 10:00 Woodstock Job heads back down the Port Burwell Subdivision for home.
Surprise, surprise, the 10:00 Woodstock Job throttles up past the fixed advance signal to Carew with empty multi's pulled from W. Coak at Woodstock. Thanks Joe for the smoke show !
Sitting in high idle outside the barn, OSRX 1210 is alive and well again after dumping her water this morning.
Cando Contracting SW1200RSu 1004 and GP9RM 4014 undergo maintenance in one of the sidings located on the northern end of CN Rail’s Camrose Sub. Both units are assigned to Imperial Oil’s Strath... (more)
Cando Contracting SW1200RSu 1004, built in 9/58 as CP 8118, undergoes maintenance in one of the sidings located on the northern end of CN Rail’s Camrose Sub. CCGX 1004 is currently assigned to I... (more)
CP 1270,1271 work the yard at Sault Ste. Marie, Ont.
A little fuel tank inspection