BNSF 3193 Leads the Columbus job 852 today through Becker ms. BNSF 3193 started life as a Santa Fe EMD GP-50 with 3500HP but was rebuilt and downgraded to 2500HP and reclassified as a GP-25.
On the first day of 2012, a bare table train from San Bernardino heads to March Field siding for storage. GP25 3203 is former Santa Fe GP50 3850 derated to 2500hp.